Nissan Sunny service from 1991 to 1997 of release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and exhaust system
7. System of start-up of the engine
8. Coupling
8.1. Specifications
8.2. Coupling adjustment
8.3. Coupling cable
8.4. Coupling pedal
8.5. Coupling
8.6. Mechanism of switching off of coupling
9. Transmissions
10. Semi-axes
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 







8-6-mekhanizm-vyklyucheniya-scepleniya.html

8.6. Mechanism of switching off of coupling

Removal

PERFORMANCE ORDER
1. Remove a check point (see subsection 9.1).
2. Remove vyzhimny the bearing, having got brackets.
3. Beat out pins (are specified by shooters) and remove a fork from an axis.
4. Designate spring orientation, remove the lever, a fork and a spring.

Check

PERFORMANCE ORDER
1. Check a condition of details, worn-out details replace.
2. Beat out the plug of an axis and replace.
3. Replace vyzhimny the bearing at the slightest signs of damages.

Installation

PERFORMANCE ORDER
1. Grease rubbing surfaces of an axis with refractory greasing.
2. Establish the fork lever in a place.
3. Establish a fork and a spring, push the lever against the stop.
4. Combine openings of a fork and press new pins.
5. Establish brackets (are specified by shooters), slightly grease a shaft and the bearing.
6. Establish the bearing so that brackets entered into gearing with a fork.
7. Check freedom of moving of a fork on an axis.
8. Establish a check point.


8.5. Coupling

9. Transmissions