Nissan Sunny service from 1991 to 1997 of release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semi-axes
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
14.1. Specifications
14.2. Detection of malfunctions
14.3. Safety locks and relay
14.4. Switches
14.5. Lamps of external lighting
14.6. Lamps of internal lighting
14.7. Devices of external lighting
14.8. Adjustment of headlights
14.9. Dashboard
14.10. Sound signal
14.11. Cable of a drive of a speedometer
14.12. Lever of brushes of a screen wiper
14.13. Electric drive of a cleaner of a windscreen
14.14. Electric drive of a cleaner of back glass
14.15. Details of screen wipers
14.16. Radio tape recorder
14.17. Loudspeakers
14.18. Aerial
14.19. Pillows of system of safety
14.20. Electric equipment schemes
 







14-4-pereklyuchateli.html

14.4. Switches


Prevention

At removal of any switch disconnect the battery from weight.


Removal and installation

PERFORMANCE ORDER
Switch of ignition and wheel lock
1. Look subsection 12.10.
Combination of switches on a steering column
2. Remove overlays of a steering column.
3. Take the necessary switch from an arm (a photo at the left), having submitted on itself, having opened the socket (a photo on the right).
4. The switch is established upside-down.
Push-button switches in an average part of the forward panel
5. Remove an average part of the panel.
6. Disconnect sockets from switches.
7. Submit the switch forward and get.
8. Assembly is carried out upside-down.
Switch of the fan of a heater
9. Remove the control panel a heater (see subsection 5.1.1).
10. Get the handle of management of the fan.
11. Release latches (two below and one above) and get the switch.
12. Establish the switch upside-down.
Switches from the driver
13. The switch of a drive of a mirror, illumination of the dashboard, forward fog lights belong to these switches.
14. Remove a dashboard casing with a ventilating nozzle.
15. Working under the panel, release latches and get the switch. Disconnect the socket.
16. At assembly insert the switch before click. Establish a dashboard casing with a ventilating nozzle.
Switch of the electric drive of a window regulator
17. Hook and get the switch and disconnect the socket. The socket fastens a bracket from within therefore it can be necessary to remove the door panel.
18. Establish the door panel, insert the switch before click.
Switch of a drive of the hatch
19. Carefully, having wound an edge of a thin screw-driver of PHV-with a tape, hook the switch which is in the case of a drive of the hatch.
20. Disconnect the socket and get the switch.
21. Assembly is carried out upside-down.
Trailer switches of the alarm system leaky closed a door / plafond of illumination of a door
22. Open a door. The switch is on a forward rack of a doorway.
23. Unscrew screws and get the switch, disconnect the socket.
24. Establish the switch upside-down. Check correctness of installation of a sealant.


14.3. Safety locks and relay

14.5. Lamps of external lighting