Nissan Sunny service from 1991 to 1997 of release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semi-axes
11. Brakes
12. Suspension brackets and steering
12.1. Specifications
12.2. Bearings of naves of forward wheels
12.3. Rack of a forward suspension bracket
12.4. Bottom lever
12.5. Spherical support of the bottom lever
12.6. Stabilizer of cross-section stability of a forward suspension bracket
12.7. Bearings of back wheels
12.8. Details of a back suspension bracket
12.9. Wheel
12.10. Switch of ignition and lock of blocking of a steering column
12.11. Steering column
12.12. Steering mechanism
12.13. Covers of steering transfer
12.14. Hydraulic actuator
12.15. Pump of the hydraulic booster
12.16. Tips of steering draft
13. Body
14. Electric equipment
 







12-15-nasos-gidrousilitelya.html

12.15. Pump of the hydraulic booster

Removal

PERFORMANCE ORDER
1. Lift a forward part of the car and establish on supports.
2. Remove a belt of a drive of the pump.
3. Unscrew a bolt of the ring union of a high pressure, disconnect from the pump a hose.
4. Merge liquid.
5. Disconnect the union of the return highway.
6. Unscrew bolts and remove an arm of a natyazhitel.
7. Turn a pump pulley that one of openings of a pulley was combined with a coupling bolt.
8. Unscrew a nut of a coupling bolt and remove washers.
9. Get a coupling bolt, holding the pump, and get the pump.
10. On a part of cars it is required to unscrew bolts of an arm and to remove the pump, having lowered down.

Installation

PERFORMANCE ORDER
1. The pump is established upside-down.
2. Replace laying of the union of a high pressure, adjust a belt tension.


12.14. Hydraulic actuator

12.16. Tips of steering draft