Nissan Sunny service from 1991 to 1997 of release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semi-axes
10.1. Specifications
10.2. Semi-axis removal
10.3. Semi-axis installation
10.4. Repair of a semi-axis and replacement of protective covers
10.5. Check of CV JOINTS
10.6. Bearing of an intermediate support of the right semi-axis
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 







10-6-podshipnik-promezhutochnojj-opory-pravojj-poluosi.html

10.6. Bearing of an intermediate support of the right semi-axis

Replacement

PERFORMANCE ORDER
1. Remove the right semi-axis.
2. Remove the internal CV JOINT, the bearing and the bearing case.
3. Clamp a semi-axis in a vice and press a gryazeotrazhatel in hammer blows on an opravka.
4. Hook and get a bearing cover from outside which is turned inside.
5. Get a lock ring of the bearing.
6. Press the bearing assembled with the case from a semi-axis. If the bearing changes, it can be beaten out carefully in hammer blows on an opravka.
7. Get a lock ring of the bearing from the outer side.
8. Get a bearing cover.
9. Vypressuyte the bearing from the case in blows on an opravka which rests against an external holder.
10. Before assembly put in the bearing greasing.
11. Press the bearing in the case so that it was possible to establish a cover and a lock ring.
12. Establish an emphasis under an internal holder and press in the bearing a semi-axis in blows on an end face through a wooden pro-rate so that it was possible to establish an internal lock ring.
13. Carefully напрессуйте gryazeotrazhatel.
14. Establish the CV JOINT.
15. Establish a semi-axis.


10.5. Check of CV JOINTS

11. Brakes