Nissan Sunny service from 1991 to 1997 of release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semi-axes
10.1. Specifications
10.2. Semi-axis removal
10.3. Semi-axis installation
10.4. Repair of a semi-axis and replacement of protective covers
10.5. Check of CV JOINTS
10.6. Bearing of an intermediate support of the right semi-axis
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 







10-4-remont-poluosi-i-zamena-zashhitnykh-chekhlov.html

10.4. Repair of a semi-axis and replacement of protective covers

EXTERNAL CV JOINT

PERFORMANCE ORDER
1. Remove a semi-axis.
2. Measure length (L) cover in a collected condition.
3. Remove collars and displace a cover in an average part of a semi-axis.
4. If the CV JOINT does not change, put labels of its mutual orientation concerning a semi-axis.
5. Clamp a semi-axis in a vice.
6. Screw a nut on a semi-axis and by means of a stripper remove the CV JOINT, without having damaged thus a carving. The CV JOINT can be removed in hammer blows, having driven a lock ring in a flute.
7. Remove a cover and get a lock ring.
8. Wash out the CV JOINT in kerosene and carefully dry.
9. At detection of the slightest signs of wear replace the CV JOINT assembled.
10. At assembly wrap up shlitsa of a semi-axis a tape.
11. Dress on a semi-axis a collar and a cover.
12. Remove a tape and insert into a semi-axis a new lock ring.
13. Put on the CV JOINT, having combined the put labels (if the CV JOINT did not change).
14. Screw a nut, clamp a semi-axis in a vice and in easy blows of a hammer besiege the CV JOINT so that the lock ring came into a flute.
15. Put in a cover special greasing, overwind a cover that greasing came into folds.
16. Distribute in a cover all superfluous greasing.
17. Dress a cover on the CV JOINT, dress a new collar.
18. Bend the termination of a collar and fix ears.
19. Establish a cover so that the length measured at dismantling was sustained.
20. Be convinced that the edge of a cover came into a semi-axis flute.
21. Fix a cover a small collar.
22. Establish a semi-axis.

Internal CV JOINT

BALL CV JOINT

PERFORMANCE ORDER
1. Execute actions in subitem 1-18. Have to a look that the CV JOINT acts in film only in hammer blows on an opravka, the shock stripper is not applied.
2. Check length (L) cover.

THREE-ROLLER CV JOINT

PERFORMANCE ORDER
1. Remove a semi-axis.
2. Measure length of a cover in a collected condition.
3. Remove collars and displace a cover in an average part of a semi-axis.
4. If the CV JOINT does not change, put labels of mutual orientation of the case of the CV JOINT concerning a semi-axis.
5. Remove the CV JOINT case so, rollers should remain on a hinge tripod.
6. Put labels on a tripod and on semi-axes.
7. Get a lock ring.
8. Remove a hinge tripod.
9. Wash out the CV JOINT in kerosene and carefully dry.
10. Attentively examine the hinge.
11. At detection of the slightest signs of wear replace the CV JOINT.
12. The new CV JOINT steals up on marking on a lateral surface of the replaced hinge.
13. Wrap up a tape of a shlitsa of a semi-axis.
14. Put on a semi-axis a collar and a cover.
15. Remove a tape and dress a hinge tripod, having combined the put labels (if the CV JOINT did not change).
15. Fix the hinge a new lock ring.
16. Put in the hinge case special greasing (it is delivered complete with the new hinge), distribute greasing round rollers.
17. Put on a tripod the hinge case, having combined the put labels of the case and a semi-axis (if the CV JOINT did not change).
18. Dress a cover on the CV JOINT case, dress a new collar.
19. Tighten a collar, bend the termination of a collar and fix ears.
20. Establish a cover so that the length measured at dismantling was sustained.
21. Be convinced that the edge of a cover came into a semi-axis flute.
22. Fix a cover a small collar.
23. Establish a semi-axis.


10.3. Semi-axis installation

10.5. Check of CV JOINTS